ClientCentral Rail Systems Alliance
ProjectLNW Works Delivery
DurationOngoing
Value£200,000

Project Description

Delivery of Grip 4&5 design in support of CP6 works delivery renewals. The initial work package encompassed a total of 9 sites, which were quite varied in nature.

Scope of works included;

  • Scope definition liaising with the project team
  • Engineering Assurance and CRE provision
  • Access Planning
  • Topographical, PWay and Civil Engineering Surveys
  • Permanent Way Design (Form-A/B)
  • Civil Engineering Design (Forms-001/002 & 003)

The design element included traditional plain line design, long timber renewals (including renewal / re-design of holding down arrangements) and Switch & Crossing design for the double junction at Marple Wharf. In addition, we developed an Option Selection Report for the conversion of a UB119 from long timber to slab track

InoRail worked closely with CRSA and the Network Rail project team to develop the project scope and produce fully integrated design solutions